10/5/26 1:57 pm Brunswick Landing Electric Utility – Fall / Winter Power Outage Reporting – 2026 More info

Pay Bill

Skip to content
10/5/26 1:57 PM Brunswick Landing Electric Utility – Fall / Winter Power Outage Reporting – 2026 More info

Pay Bill

Brunswick Landing
Maine's Center for Innovation
Brunswick Landing
  • Home
  • News
  • Business
    • Grow With Us
      • Brunswick Landing — Maine’s Center for Innovation
      • Available Properties
      • Directory
      • Join Brunswick Landing
      • Why Choose Brunswick Landing?
      • Assistance & Incentives
    • Featured Industries
      • Aviation & Aerospace
      • BioTech & Life Sciences
      • Advanced Materials & Composites
      • IT & Cybersecurity
      • CleanTech & Renewable Energy
    • TechPlace
      • TechPlace – Maine’s Technology Incubator
      • TechPlace Spaces
      • TechPlace Members
      • Become a TechPlace Member
  • Air Travel & Transport
  • Education
  • Living & Recreation
Search:
  • Home
  • News
  • Business
    • Grow With Us
      • Brunswick Landing — Maine’s Center for Innovation
      • Available Properties
      • Directory
      • Join Brunswick Landing
      • Why Choose Brunswick Landing?
      • Assistance & Incentives
    • Featured Industries
      • Aviation & Aerospace
      • BioTech & Life Sciences
      • Advanced Materials & Composites
      • IT & Cybersecurity
      • CleanTech & Renewable Energy
    • TechPlace
      • TechPlace – Maine’s Technology Incubator
      • TechPlace Spaces
      • TechPlace Members
      • Become a TechPlace Member
  • Air Travel & Transport
  • Education
  • Living & Recreation

Daily Archives: September 6, 2024

Harry Rich Drive Closure Next Week

Brunswick Landing, MRRA in the NewsBy Brunswick LandingSeptember 6, 2024Leave a comment

9/6 Beginning on Monday 9/9, Admiral Harry Rich Dr. will be closed to through-traffic due to the new sewer line addition. The closure will begin Monday afternoon and will carry…

Virtual RAB Meeting – 10/2

Brunswick Landing, MRRA in the NewsBy Brunswick LandingSeptember 6, 2024Leave a comment

Virtual RAB Meeting, NAS Brunswick – Oct. 02, 2024 The Naval Facilities Engineering Systems Command Base Realignment and Closure Program Management Office (NAVFAC BRAC PMO) announces a meeting of the…

bluShift Aerospace to Conduct Static Engine Test

Aviation & Aerospace, Brunswick Landing, MRRA in the NewsBy Brunswick LandingSeptember 6, 2024Leave a comment

Exciting News!!! bluShift Aerospace will be performing a static engine test of its MAREVL rocket engine on Friday, September 6th, sometime between 4-7pm. This test will be longer than those…

9/5 Update 6 From DEP

Alert, Brunswick Landing, MRRA in the NewsBy Brunswick LandingSeptember 6, 2024Leave a comment

Update 6: DEP will assist in facilitating the transition from emergency response to long-term remediation in Brunswick September 5, 2024 As operations move from the response phase to the long-term…

Website Design by Wendy Clark Design

Unless otherwise noted, all content © 2026 Midcoast Regional Redevelopment Authority

Go to Top